We use essential cookies. With your consent we also turn on statistics (Google Analytics 4) and advertising measurement (Google Ads). Details: Cookie policy.
Electrical design consultancy · Kraków · since 2003
Eko Elprom — always ON
We design power for buildings that cannot switch off.
Data centres, airports, hospitals, factories and housing. Electrical, MV/LV networks, ELV, BMS and PV — from concept to designer's supervision, in 2D and in BIM (Revit). Unrestricted design licences.
Designing power systems since 2003. Founded by Marek Łagodziński — a designer with unrestricted design licence since 2006. Since 2010 we have operated as EKO ELPROM Sp. z o.o., working across Poland and Europe.
From air traffic control towers and data centres to factories, housing and hospitals. Photos: our archive and partner materials — credits in the descriptions.
AirportsAir Traffic Control Tower, BaliceKraków Airport air traffic control tower — detailed design of ELV systems for contractors (GURECO, API SMART, PORR).commissioned by (contractors): GURECO · API SMART · PORR
InfrastructureRevitalisation of the Old Market Square, PoznańBIM · Revit 3DOld Market Square, Poznań (City of Poznań, design & build, BIM): from concept design and functional and utility programme (PFU) to detailed design and designer's site supervision — electrical and ELV disciplines in a consortium with WLC.design consortium (WLC: roads, structural engineering, water & drainage) · lead design consultant Graph'it · client City of Poznań: WLC Inżynierowie · Graph'it (Warszawa) · 2021–2024
InfrastructureOld Market Square, Poznań — BIM modelBIM · Revit 3DBIM model of the Old Market Square — electrical and ELV design.BIM model: WLC Inżynierowie · 2021–2024
AirportsAirport Terminal, RadomBIM · Revit 3DNew Warsaw-Radom passenger terminal (30,000 m²): detailed design of electrical installations in 2D and 3D (Revit) for general contractor MIRBUD.architecture · general contractor: PIG Architekci · general contractor MIRBUD · 2019–2023
AirportsRyanair Maintenance Hangar, Wrocław AirportRyanair MRO hangars in Wrocław (usable floor area 11,028 m²): single-bay and two-bay hangars with a staff and office section — building permit design and tender design.multidisciplinary lead design consultant · client: Ryanair: WLC Inżynierowie · 2024–2025
AirportsRyanair Maintenance Hangar, BerlinThree-bay Ryanair hangar at Berlin airport (usable floor area 8,772 m²) with a staff and office section — tender design and detailed design.multidisciplinary lead design consultant · client: Ryanair: WLC Inżynierowie · 2024–2025
Data centresICM Server Room, Warsaw — ROTARY UPSOCEAN Competence Centre, ICM UW (University of Warsaw) — data centre designed to Tier III: 4 MW supply (ultimately 10 MW), 2×DRUPS 1600 kW; electrical, ELV and plumbing & HVAC design.architecture: Skoczek & Wojdacki Architekci · 2013–2014
IndustrialHutchinson Production Hall, Dębica20,224 m² production and warehouse hall: 2.5 MVA MV service connection, 2×1600 kVA substation, 2,080 kW generator set.architecture · general contractor: Biuro Projektów Lewicki Łatak · general contractor Hochtief · 2017
ResidentialMieszkaj w Mieście — IMMO, KrakówMedusa Group housing development for Henniger Investment (IMMO 1–5 and Graby buildings, approx. 60,000 m², European Property Awards) — detailed design of electrical and ELV systems.architecture (Przemo Łukasik, Łukasz Zagała): Medusa Group · 2016–2022
OfficesMoonoffice Office Building, KrakówLEED Platinum office building on ul. Bułhaka (PUU 5,125 m², 6 storeys, 86 parking spaces) — MV supply, substation, electrical, ELV systems, BMS.architecture · structural engineering · client CK Management: ION Architekci · WLC Inżynierowie · 2018
HealthcarePrzylądek Nadziei (Cape of Hope) — Paediatric Oncology Clinic, Wrocław12,273 m² clinic (general contractor Erbud): 2×1250 kVA substation, 630 kVA generator set, 160 kVA UPS, networks, site lighting, I&C and BMS — detailed design and revised building permit design.architecture · general contractor Erbud S.A.: ION Architekci · WLC Inżynierowie · 2013–2015
Since 2003 we have designed installations for more than 180 developments — for general contractors, developers, retail chains, industry, the energy sector, hospitals, local authorities, state institutions and architectural practices across Poland and Europe — from Kraków to Berlin, and as far as New Delhi.
The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time.
Project Manager, ANNA-BUD Sp. z o.o. (general contractor)Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022
The documentation they produced met the highest standards. (…) The design services provided by this team are worthy of recommendation to other organisations.
Sales Director, Building Automation Division, Asseco Poland S.A.Tier III data processing centre, Kraków · 2013
The Eko Elprom design office delivered on time and showed great professionalism and expertise.
Management Board, ION ArchitekciCape of Hope children's oncology clinic, Wrocław · 2018
The commission was carried out with due attention to detail, appropriate to the difficulty of the task.
Architect, Biuro Projektów Lewicki ŁatakHutchinson production hall, Dębica (20,224 m²) · 2018
Quotes from reference letters, translated from Polish.
Police station at CPK Airport in Baranów — electrical and ELV design, in the Kallan · WLC Inżynierowie team (in progress).
BIM · Revit 3D
AirportsCMGO — Central Waste Collection Point, Kraków AirportAKE Studio
CMGO at Kraków-Balice Airport: power supply, site lighting, weighbridge, container shelter and photovoltaics — with AKE Studio, in Revit 3D (in progress).
Answers to the questions we hear most often from clients, architects and general contractors at the quotation stage.
It depends on the type of building, its floor area and the scope (electrical installations, MV/LV network, ELV systems, BMS, photovoltaics). We prepare each quote individually after reviewing the functional and utility programme (PFU), floor plans or project scope — free of charge and without obligation. We reply within one working day and send the quote within two working days.
It depends on the phase and scale — a concept design with a power balance usually takes a few days for a typical building (a few weeks for server rooms and data centres), a building permit design including approvals with the distribution system operator a few weeks, and we align the detailed design with the construction schedule.
Yes. Alongside 2D documentation (PDF, DWG) we model electrical and ELV installations in Autodesk Revit (BIM 3D), with cross-discipline coordination and clash detection before construction starts. Projects delivered in Revit include the Warsaw-Radom airport terminal, the Old Market Square in Poznań (BIM with a CDE platform), the Airport Fire Service at Katowice-Pyrzowice, the City One office building in Wrocław, the Wrocław Airport terminal extension and the CMGO facility at Kraków-Balice Airport.
Yes. Our Managing Director, Marek Łagodziński, has held an unrestricted design licence in the building services speciality (electrical networks, installations and equipment) since 2006. The team also includes other designers with unrestricted licences, and assistant designers work under their supervision and professional responsibility.
Yes — we design PV installations (rooftop and ground-mounted) as an integral part of the building's power supply, together with power distribution, uninterruptible power supply and approvals with the distribution system operator, so everything is consistent from the very first power balance.
We design across Poland and Europe, and further afield — our projects include Kraków, Warsaw, Wrocław, Poznań, Radom, Białystok, Bydgoszcz, Niepołomice and Czechowice-Dziedzice, a Ryanair maintenance hangar in Berlin and the server room of the Polish Embassy in New Delhi. Our office is in Kraków; project coordination (online meetings, model and document exchange) and site visits work regardless of the country where the building is located.
Designer's site supervision is the designer's presence during construction — explaining design solutions to the contractor, approving substitutes and changes on site, and preparing as-built documentation. We provide it for most of our projects, from concept design to handover of the building.
We design at every scale: data centres, airports and factories, but also office buildings, hotels, housing developments, and public and retail buildings. The common denominator is responsibility for a power supply that must work reliably.
The quickest way is the form below or e-mail — a functional and utility programme (PFU), floor plans or even just a description of the scope, the location and an indicative timeframe is enough. On that basis we prepare a free quote and propose a schedule.
Contact
Free design quote
We work with architects, contractors and investors. Send us the scope, drawings or brief — we will reply with a quote and a schedule.
The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →