Industrial
PKP Energetyka Locomotive Repair Hall with Technical Facilities, Tarnów
Locomotive repair hall with railway siding and office/staff building — power supply, hall lighting, networks and ELV systems.

Project description
Scope and solutions
The project comprised a locomotive repair hall together with a railway siding, a car park and an office/staff welfare building. The buildings reference modernist architecture. Rhythmic vertical window divisions visually shorten the two-storey massing of the office/staff building, elongated for functional reasons. The locomotive repair hall, added on the north-east side, matches the height and width of the existing rail-trolley (draisine) hall. Its window divisions correspond to those of the office/staff section.
Other projects

Detailed design of power networks for the extension of the Mercedes-Benz engine and battery plant (2022) — with WLC Inżynierowie and Elektrotim.

Extension of the MAN Trucks bus factory — power distribution and ELV networks for a 10 MW plant (building permit design + detailed design), with WLC Inżynierowie.

20,224 m² production and warehouse hall: 2.5 MVA MV service connection, 2×1600 kVA substation, 2,080 kW generator set.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland