BIM design (Revit)
We design in BIM. Not instead of the design — before the clash on site
We model electrical and ELV systems in Autodesk Revit: containment, switchboards, luminaires and equipment. We coordinate with architecture, structure and mechanical, and close clashes on the CDE — before anyone cuts a slab.
Scope
What the design covers
- Revit model of the electrical discipline: LV switchboards (size, level, code), cable trays, ladders and conduits, general, emergency and escape lighting with power and circuit parameters
- UPS, generator, ATS, transformer — as devices with power; earthing and lightning protection as the main routes
- ELV in a separate workset or file: fire alarm, voice alarm, intruder alarm, access control, CCTV, racks — with a containment separation rule
- Openings and reservations for structure and mechanical — clash: slab–tray, shaft–duct, switchroom–structure
- Working on the architect's coordination model (linked, not copied) and on the project CDE: Autodesk Docs / BIM 360 or the client's platform
- Electrical BEP: the client's Revit version, shared coordinates, file and workset naming, LOD per stage, clash schedule
- Clash report (Navisworks / Revit): number, view, discipline, status — only clashes that cost money on site
- Schedules from model parameters: luminaires, switchboards, containment lengths — for bills of quantities and tender
- Issue: PDF sheets from the model, DWG plans, discipline IFC; RVT where the contract provides for it
- Conventional documentation outside the model: single-line diagrams, calculations, DSO connection conditions, expert approvals
Why Eko Elprom
What the client gains
Containment, switchrooms and shafts checked against structure and ventilation in the model — not while cutting the slab.
A model when the architecture is in Revit or the building cannot afford clashes (airport, data centre, hospital). DSO networks and simple revisions — in 2D, no surcharge for "blocks".
Old Market Square in Poznań — documentation entirely in BIM with a CDE platform; the same cycle runs on the Wrocław terminal and CMGO at Kraków Airport.
They receive PDF, DWG and IFC. Unrestricted licences and the designer's liability stay with the person, not the model.
Process
From first sketch to handover
One lead designer at every stage. Cross-discipline coordination, approvals with distribution system operators and utilities, presence on site.
Koncepcja i bilans mocy
Analiza potrzeb, bilans mocy, dobór źródeł zasilania podstawowego i rezerwowego, warunki przyłączenia.
Projekt budowlany
Dokumentacja do pozwolenia na budowę, uzgodnienia z OSD, operatorami i rzeczoznawcami.
Detailed design
Schematy, rzuty, obliczenia, zestawienia materiałów i przedmiary — gotowe do przetargu i realizacji.
Designer's site supervision
Contractor support, site changes, acceptance and as-built documentation.
Projects
Selected projects in this field
Photos from our project archive. See all projects →






FAQ
Client questions
Answers to the questions we hear most often when quoting this type of project.
Contact
Free quote: bIM design (Revit)
Send drawings, a brief or a short scope description — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
Electrical department
ELV department
Telecommunications design
+48 533 317 286
HVAC automation & BMS
+48 507 874 718
