Airports · 2019–2023
Airport Terminal, Radom
New Warsaw-Radom passenger terminal (30,000 m²): detailed design of electrical installations in 2D and 3D (Revit) for general contractor MIRBUD.

Project description
Scope and solutions
Passenger terminal of the new Warsaw-Radom airport, approx. 30,000 m² — architecture by PIG Architekci, general contractor MIRBUD S.A. Eko Elprom: building permit design and tender design (for WLC Inżynierowie/GMT) and detailed design of electrical installations, developed in 2D and as a 3D Revit model: MV supply, transformer substations, power distribution, supply to airport and baggage handling systems, lighting of halls and apron, lightning protection, telecommunications networks.
Projects
Other projects

Extension of the Wrocław-Strachowice passenger terminal — electrical and ELV systems, design in progress.

Buildings B1, B3 and K1 (7,600 m²): 15 kV/1.3 MW, 2×1250 kVA substation, 1,400 kVA generator set, 4×200 kVA UPS.

Road layout of the new Radom airport: MV and LV networks, transformer substations, lighting and ELV networks — detailed design for general contractor Drogomex.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
Office
Electrical department
ELV department
Telecommunications design
+48 533 317 286
HVAC automation & BMS
+48 507 874 718