ELV systems

ELV installation and security systems design

Fire alarm, voice alarm, CCTV, access control and structured cabling — designed together with the electrical installations and agreed with the fire safety expert.

Scope

What the design covers

  • Fire alarm system (FAS), control of smoke control and fire safety equipment, fire scenarios
  • Voice alarm system (VAS), paging systems
  • IP CCTV, video analytics systems
  • Access control, time & attendance, intruder and hold-up alarm systems (I&HAS)
  • LAN structured cabling, WLAN networks, fibre optics, building server rooms
  • Door entry and video door entry systems, TV/SAT, audio-visual and multimedia systems
  • Integration of security systems (SMS/PSIM), interfacing with BMS
  • Approvals with the fire safety expert, designer's site supervision

Why Eko Elprom

What the client gains

Dedicated ELV department

An ELV systems designer on the team since 2014 — for us, ELV systems are not an add-on to electrical design.

A fire scenario without gaps

We design FAS, smoke control, VAS and fire safety controls as one coherent scenario agreed with the fire safety expert.

Hotels, offices, public buildings

Hilton, Marriott, UKNF (Polish Financial Supervision Authority), sports halls, museums — facilities with high security requirements.

Single coordination with electrical design

We agree routes, power supply and space allocation within the team, not between firms.

Process

From first sketch to handover

One lead designer at every stage. Cross-discipline coordination, approvals with distribution system operators and utilities, presence on site.

01

Concept and power balance

Needs analysis, power balance, selection of primary and standby power sources, grid connection conditions.

02

Building permit design

Documentation for the building permit, approvals with the distribution system operator, utilities and certified experts.

03

Detailed design

Schematics, layouts, calculations, material schedules and bills of quantities — ready for tender and construction.

04

Designer's site supervision

Contractor support, site changes, acceptance and as-built documentation.

Projects

Selected projects in this field

Photos from our project archive. See all projects →

Hampton by Hilton Hotel — Eko Elprom project
HotelsHampton by Hilton HotelHampton by Hilton Kraków-Balice (Susuł & Strama Architekci): MV supply, substation, hotel installations, FAS, VAS.architecture: Susuł & Strama Architekci · 2012–2019
Moonoffice Office Building, Kraków — Eko Elprom project
OfficesMoonoffice Office Building, KrakówLEED Platinum office building on ul. Bułhaka (PUU 5,125 m², 6 storeys, 86 parking spaces) — MV supply, substation, electrical, ELV systems, BMS.architecture · structural engineering · client CK Management: ION Architekci · WLC Inżynierowie · 2018
Przylądek Nadziei (Cape of Hope) — Paediatric Oncology Clinic, Wrocław — Eko Elprom project
HealthcarePrzylądek Nadziei (Cape of Hope) — Paediatric Oncology Clinic, Wrocław12,273 m² clinic (general contractor Erbud): 2×1250 kVA substation, 630 kVA generator set, 160 kVA UPS, networks, site lighting, I&C and BMS — detailed design and revised building permit design.architecture · general contractor Erbud S.A.: ION Architekci · WLC Inżynierowie · 2013–2015
KS Cracovia Centenary Sports Hall — Eko Elprom project
Public buildingsKS Cracovia Centenary Sports HallSports hall with a Disability Sports Centre, 5,130 m² — from a 630 kVA substation to a ticketing system.architecture · general contractor: Biuro Projektów Lewicki Łatak · general contractor Skanska · 2017
Institute of Geological Sciences, Jagiellonian University (UJ), ul. Gronostajowa, Kraków — Eko Elprom project
Public buildingsInstitute of Geological Sciences, Jagiellonian University (UJ), ul. Gronostajowa, KrakówUJ teaching and research building (4 storeys + basement, design & build): 2×1 MVA substation, UPS, Faraday cage, BMS.architecture · plumbing & HVAC · general contractor: ION Architekci · WLC Inżynierowie · general contractor Aldesa · 2014–2017
UKNF Headquarters, ul. Jasna 12, Warsaw — Eko Elprom project
OfficesUKNF Headquarters, ul. Jasna 12, WarsawReconstruction and extension of the UKNF office building (5,606 m²): 300 kVA UPS, 600 kVA generator set, 1000 kVA substation, server room (for Krib Sp. z o.o.).architecture (Łukasz Jaroszewski): ION Architekci · 2010–2011

FAQ

Client questions

Answers to the questions we hear most often when quoting this type of project.

Yes — we prepare FAS, VAS and fire safety control designs in line with the fire scenario and manage approval with the fire safety expert.
Yes, although one team for both disciplines gives the best results. With a separate electrical designer, we coordinate routes and power supply for the systems.

Contact

Free quote: eLV systems

Send drawings, a brief or a short scope description — we will reply with a quote and a schedule within one working day.

Quick enquiry

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland

    ELV department

    Telecommunications design

    Paweł Dobranowski
    +48 533 317 286

    HVAC automation & BMS

    Krzysztof Stajnder
    +48 507 874 718

    CEO & lead designer

    mgr inż. Marek Łagodziński · +48 604 152 533
    Map: ul. Myśliwska 66/123, 30-718 Kraków
    EKO ELPROM Sp. z o.o.ul. Myśliwska 66/123, 30-718 Kraków
    Directions
    © OpenStreetMap

    Call Free quote