Electrical design for airports
Terminals, air traffic control towers, airport fire stations, hangars and infrastructure — electrical, ELV and power networks from one team, in 2D and BIM (Revit).
Scope
What the design covers
- Passenger terminals and ancillary buildings: power distribution, guaranteed supply, normal and emergency lighting
- Air traffic control towers: power for equipment and server rooms, UPS, generators, ELV systems
- Airport fire stations and service buildings
- MRO hangars with office and welfare areas
- Apron, road and site lighting with photometric calculations
- MV/LV networks, transformer substations and cable ducts on airport sites
- Fire alarm, voice alarm, CCTV, access control and structured cabling
- BIM models (Revit 3D) within the lead designer's team
Why Eko Elprom
What the client gains
From the Kraków-Balice air traffic control tower to the CPK Airport VIP terminal — terminals, towers, fire stations and hangars.
Revit 3D for the Radom and Wrocław terminals and CPK buildings — with AKE Studio, WLC Inżynierowie and TPF.
UPS and generator systems for equipment that must always run — including air navigation equipment.
We design for airport operators and for general contractors.
Process
From first sketch to handover
One lead designer at every stage. Cross-discipline coordination, approvals with distribution system operators and utilities, presence on site.
Concept and power balance
Airport operator's requirements, power balance, primary and backup supply, grid connection conditions.
Building permit design
Building permit documentation, approvals with the operator and the fire safety expert.
Detailed design
Diagrams, layouts or BIM model, calculations, schedules and bills of quantities — ready for tender.
Designer's site supervision
Contractor support, site changes, acceptance and as-built documentation.
Airport projects
Photos: our archive and partner materials — credits in the descriptions. See all projects →














FAQ
Client questions
Answers to the questions we hear most often when quoting this type of project.
Contact
Free quote: airport project
Send drawings, a brief or a short scope description — we will reply within one working day and send a quote with a schedule within two working days.
The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
