Airports · 2024–2025
Ryanair Maintenance Hangar, Berlin
Three-bay Ryanair hangar at Berlin airport (usable floor area 8,772 m²) with a staff and office section — tender design and detailed design.

Project description
Scope and solutions
Ryanair aircraft maintenance hangar at Berlin Airport (BER) — a three-bay hangar with a two-storey staff and office section, usable floor area 8,771.83 m²; design 2024–2025, construction 2025. Full multidisciplinary documentation by WLC Inżynierowie (tender design and detailed design); Eko Elprom — electrical and ELV systems to German standards (DIN/VDE): power supply and distribution, supply to aircraft servicing equipment, hangar and apron lighting, lightning protection and earthing, FAS/VAS, CCTV, access control, structured cabling. Visualisation: WLC Inżynierowie.
Projects
Other projects

Extension of the Wrocław-Strachowice passenger terminal — electrical and ELV systems, design in progress.

New Warsaw-Radom passenger terminal (30,000 m²): detailed design of electrical installations in 2D and 3D (Revit) for general contractor MIRBUD.

Buildings B1, B3 and K1 (7,600 m²): 15 kV/1.3 MW, 2×1250 kVA substation, 1,400 kVA generator set, 4×200 kVA UPS.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
Office
Electrical department
ELV department
Telecommunications design
+48 533 317 286
HVAC automation & BMS
+48 507 874 718