Airports · 2020–2022

Air Traffic Control Tower, Radom

Air traffic control tower with Airport Fire Service, 3,902 m²: 15 kV/1 MW, 2×630 kVA substation, 900 kVA generator set, 4×75 kVA UPS.

Air Traffic Control Tower, Radom

Project description

Scope and solutions

Reconstruction of Warsaw-Radom Public Use Airport — construction of the Air Traffic Control Tower together with the Airport Fire Service and technical and road infrastructure (building B4, 3,902 m²). Detailed electrical design with specifications and approvals for general contractor ANNA-BUD (10.2020–01.2022): 15 kV supply system with 1 MW capacity, MV and LV cable duct system, 2×630 kVA transformer substation, 900 kVA generator set, 4×75 kVA, 50 kVA and 40 kVA UPS, supply to the server room, rack cabinets, PAŻP (Polish Air Navigation Services Agency) equipment, BMS automation, ventilation and air conditioning, normal and emergency lighting, reactive power compensation, lightning protection, earthing. Reference from ANNA-BUD (11.2022).

Reference letter: ANNA-BUD Sp. z o.o. (construction company)Reference letter — ANNA-BUD Sp. z o.o. (construction company)Air Traffic Control Tower with Airport Fire Station, Warsaw-Radom Airport · 2022

Contact

Planning a similar project?

Describe the building and the project stage — we will reply with a quote and a schedule within one working day.

Quick enquiry

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland

    ELV department

    Telecommunications design

    Paweł Dobranowski
    +48 533 317 286

    HVAC automation & BMS

    Krzysztof Stajnder
    +48 507 874 718

    CEO & lead designer

    mgr inż. Marek Łagodziński · +48 604 152 533

    Call Free quote