Airports · 2019

Radom Airport — Road Works Package

Road layout of the new Radom airport: MV and LV networks, transformer substations, lighting and ELV networks — detailed design for general contractor Drogomex.

Radom Airport — Road Works Package

Project description

Scope and solutions

The project covered the comprehensive design of power and telecommunications infrastructure for the road works package at Radom Airport. The scope included MV service connections, MV and LV power distribution networks, lighting and transformer substations. The design also covered a telecommunications service connection and a telecommunications network with a cable duct system. Internal electrical installations and ELV systems were also designed, ensuring full functionality and safety of the airport infrastructure in line with the highest technical standards.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland