Kraków Airport air traffic control tower — detailed design of ELV systems for contractors (GURECO, API SMART, PORR).

Air Traffic Control Tower, Balice

Project description

Scope and solutions

The ELV design for the Air Traffic Control Tower at Balice airport covered modern low-current systems supporting flight operations. The scope included CCTV, alarm systems and access control, as well as advanced communications and data transmission systems essential to control tower operations. The design was delivered to the highest standards of safety and reliability to ensure uninterrupted and efficient operation of critical aviation infrastructure.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland