Hotel at Radom Airport: MV supply, substation, installations for guest rooms and public areas, hotel systems, FAS, VAS.

Hilton Garden Inn Hotel, Radom

Project description

Scope and solutions

The project covered the comprehensive delivery of power and telecommunications infrastructure for the Hilton Garden Inn hotel in Radom. The scope included the design of medium-voltage (MV) service connections, MV and low-voltage (LV) power distribution networks, a lighting system and transformer substations. It also included the construction of a telecom service connection (tt) and a telecommunications network with a telecom cable duct system. The project further covered internal electrical installations and ELV systems, including telecommunications, CCTV, alarm systems and access control, providing modern, functional hotel infrastructure in line with the highest standards of safety and comfort.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland