Hotels

Platinum Palace Hotel, Wrocław

Boutique hotel in a historic palace: electrical installations and ELV systems designed with respect for the historic fabric.

Platinum Palace Hotel, Wrocław

Project description

Scope and solutions

The project covered the comprehensive delivery of power and telecommunications infrastructure for the Platinum Palace Hotel in Wrocław. The scope included medium-voltage (MV) service connections, MV and low-voltage (LV) power distribution networks, a lighting system and transformer substations. The project also provided for a new telecom service connection (tt) and the extension of the telecommunications network with a telecom cable duct system. Internal electrical installations and ELV systems were also designed, including telecommunications, CCTV, alarm systems and access control, delivering modern, safe hotel infrastructure that meets the highest technical standards.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland