Mercedes-Benz Manufacturing Poland, Jawor

Detailed design of power networks for the extension of the Mercedes-Benz engine and battery plant (2022) — with WLC Inżynierowie and Elektrotim.

Mercedes-Benz Manufacturing Poland, Jawor
Photo: Mercedes-Benz Manufacturing Poland

Project description

Scope and solutions

Detailed design of power distribution networks for the extension of the Mercedes-Benz Manufacturing Poland plant in Jawor (2022) — the group's first plant in Poland, producing engines and subsequently batteries for hybrid and electric cars. The scope covered the plant's power supply system: MV/LV networks and service connections, transformer substations, network switchgear and a cable duct system across the site, taking into account stringent requirements for continuity of supply to production processes. Delivered in cooperation with WLC Inżynierowie for the installation contractor Elektrotim.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland