Staco Plant Extension, Niepołomice
Staco production hall: internal electrical and ELV installations, power distribution networks, transformer substation — for general contractor Łęgprzem.

Project description
Scope and solutions
The design of internal electrical installations and ELV systems for the extension of the STACO plant in Niepołomice covered the comprehensive design of power supply to the production and office buildings. The scope included lighting installations, supply to industrial equipment and ELV systems, including CCTV, alarm systems and access control. The design was tailored to the specific requirements of a production plant, with a focus on reliability, safety and energy efficiency, providing modern infrastructure suited to the needs of a dynamically growing industrial facility.
Projects
Other projects

Detailed design of power distribution networks for the new Mercedes-Benz engine and battery plant — with WLC Inżynierowie and Elektrotim.

Extension of the MAN Trucks bus factory — power distribution and ELV networks for a 10 MW plant (building permit design + detailed design), with WLC Inżynierowie.

20,224 m² production and warehouse hall: 2.5 MVA MV service connection, 2×1600 kVA substation, 2,080 kW generator set.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
Office
Electrical department
ELV department
Telecommunications design
+48 533 317 286
HVAC automation & BMS
+48 507 874 718