Industrial
Norgpol
Production plant: service connection and transformer substation, electrical installations of the halls, site lighting, ELV systems.

Project description
Scope and solutions
The project covered the comprehensive design of power and telecommunications infrastructure for the Norgpol plant. The scope included medium-voltage (MV) service connections, MV and low-voltage (LV) power distribution networks, site lighting and transformer substations. It also provided for a new telecom service connection (tt) and the extension of the telecommunications network with a telecom cable duct system. The project further included internal electrical installations and ELV systems such as telecommunications, CCTV, alarm systems and access control, delivering modern, safe infrastructure tailored to the plant’s industrial needs.
Other projects

Detailed design of power networks for the extension of the Mercedes-Benz engine and battery plant (2022) — with WLC Inżynierowie and Elektrotim.

Extension of the MAN Trucks bus factory — power distribution and ELV networks for a 10 MW plant (building permit design + detailed design), with WLC Inżynierowie.

20,224 m² production and warehouse hall: 2.5 MVA MV service connection, 2×1600 kVA substation, 2,080 kW generator set.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland