Industrial · 2019
Lajkonik Snacks, Skawina
Lajkonik Snacks plant extension (“Space” programme) and server room: installations, power distribution networks, transformer substation with MV service connections.

Project description
Scope and solutions
Conversion of premises in the Lajkonik Snacks warehouse and production building in Skawina into a computer server room (35 m²) with internal installations (electrical, fixed fire suppression, telecommunications, plumbing & HVAC) and reconstruction of infrastructure in a public road — MV power network. Design documentation with cost estimates (02–08.2019): raised floor, switchboards, 15 kVA UPS, fire-fighter's switch, emergency lighting, surge protection, 9.5 kW in-row precision air conditioning. Reference from the client (05.2020).
Reference letter — Lajkonik Snacks Sp. z o.o.Computer server room at the Lajkonik Snacks plant in Skawina · 2020
Projects
Other projects

Detailed design of power distribution networks for the new Mercedes-Benz engine and battery plant — with WLC Inżynierowie and Elektrotim.

Extension of the MAN Trucks bus factory — power distribution and ELV networks for a 10 MW plant (building permit design + detailed design), with WLC Inżynierowie.

20,224 m² production and warehouse hall: 2.5 MVA MV service connection, 2×1600 kVA substation, 2,080 kW generator set.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
Office
Electrical department
ELV department
Telecommunications design
+48 533 317 286
HVAC automation & BMS
+48 507 874 718