The project comprised a locomotive repair hall together with a railway siding, a car park and an office/staff welfare building. The buildings reference modernist architecture. Rhythmic vertical window divisions visually shorten the two-storey massing of the office/staff building, elongated for functional reasons. The locomotive repair hall, added on the north-east side, matches the height and width of the existing rail-trolley (draisine) hall. Its window divisions correspond to those of the office/staff section.
Projects
Other projects

Detailed design of power distribution networks for the new Mercedes-Benz engine and battery plant — with WLC Inżynierowie and Elektrotim.

Extension of the MAN Trucks bus factory — power distribution and ELV networks for a 10 MW plant (building permit design + detailed design), with WLC Inżynierowie.

20,224 m² production and warehouse hall: 2.5 MVA MV service connection, 2×1600 kVA substation, 2,080 kW generator set.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
Office
Electrical department
ELV department
Telecommunications design
+48 533 317 286
HVAC automation & BMS
+48 507 874 718