Data centres · 2012–2013
Asseco / Bank BPH Data Processing Centre, Kraków
Tier 3 data processing centre: 600 m², 2×1600 kVA substation, 2 MVA UPS, 176 cabinets — lead design consultant.
Project description
Scope and solutions
“Construction of a Data Processing Centre” — extension of Bank BPH's data processing centre in Kraków for Asseco Poland S.A. (08.2012–01.2013): Tier 3 standard, 600 m² of server space with support areas, two MV service connections, 2×1600 kVA containerised substation, 1.4 MVA and 1.8 MVA generator sets, 2 MVA of UPS capacity (total for both chains), active power 1.2 MVA, 1,086 kW cooling, 176 server cabinets. Eko Elprom as lead design consultant: electrical, automation with utilities monitoring, telecommunications, ELV (IT, TEL, FAS, fixed fire suppression, VESDA, I&HAS, CCTV, access control, SMS), architecture, structural engineering, plumbing & HVAC, building permit, cost estimates. References from Asseco Poland and a letter of thanks from Bank BPH (Director of the IT Resources Management Department).
Projects
Other projects

OCEAN Competence Centre, ICM UW (University of Warsaw) — 10 MW data centre, Tier III, 4,500 m² (server space 2,000 m²), 2×DRUPS 1600 kW; electrical, ELV and plumbing & HVAC design.

384 m² server room at Quatro Business Park — multidisciplinary design for Samsung Electronics.
156 m² data centre with 500 kVA ROTARY UPS, 630 kVA substation, 327 kW cooling — multidisciplinary documentation.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
Office
Electrical department
ELV department
Telecommunications design
+48 533 317 286
HVAC automation & BMS
+48 507 874 718