Data centres · 2012–2013
Asseco / Bank BPH Data Processing Centre, Kraków
Tier III data processing centre: 600 m², 2×1600 kVA substation, 2 MVA UPS, 176 cabinets — lead design consultant.
Project description
Scope and solutions
“Construction of a Data Processing Centre” — extension of Bank BPH's data processing centre in Kraków for Asseco Poland S.A. (08.2012–01.2013): Tier III standard, 600 m² of server space with support areas, two MV service connections, 2×1600 kVA containerised substation, 1.4 MVA and 1.8 MVA generator sets, 2 MVA of UPS capacity (total for both chains), active power 1.2 MVA, 1,086 kW cooling, 176 server cabinets. Eko Elprom as lead design consultant: electrical, automation with utilities monitoring, telecommunications, ELV (IT, TEL, FAS, fixed fire suppression, VESDA, I&HAS, CCTV, access control, SMS), architecture, structural engineering, plumbing & HVAC, building permit, cost estimates. References from Asseco Poland and a letter of thanks from Bank BPH (Director of the IT Resources Management Department).
Other projects

OCEAN Competence Centre, ICM UW (University of Warsaw) — data centre designed to Tier III: 4 MW supply (ultimately 10 MW), 2×DRUPS 1600 kW; electrical, ELV and plumbing & HVAC design.

384 m² server room at Quatro Business Park — multidisciplinary design for Samsung Electronics.
156 m² data centre with 500 kVA ROTARY UPS, 630 kVA substation, 327 kW cooling — multidisciplinary documentation.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.
The documentation they produced met the highest standards. (…) The design services provided by this team are worthy of recommendation to other organisations. (translated from Polish)
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland