Data centres · 2014–2015

MON Server Room, Bydgoszcz

156 m² data centre with 500 kVA ROTARY UPS, 630 kVA substation, 327 kW cooling — multidisciplinary documentation.

Project description

Scope and solutions

Modernisation of a server room with the necessary infrastructure — a 156.18 m² data centre for a MON (Polish Ministry of National Defence) facility in Bydgoszcz (08.2014–08.2015, documentation value PLN 523,365): two MV service connections, 630 kVA containerised substation, 500 kVA/400 kW ROTARY UPS in a 20' container, active power 0.3 MVA, 327 kW chilled-water cooling with free cooling, IT cabinets with an RFID patch panel management system. Eko Elprom as lead design consultant: electrical, automation with utilities monitoring, telecommunications, ELV (IT, TEL, FAS, OXYREDUCT, VESDA, I&HAS, CCTV, access control), architecture, structural engineering, plumbing & HVAC, building permit, cost estimates, designer's site supervision. Confirmation of due performance of the contract — the Ministry's Centre for Management of ICT Networks and Services (RCZSiUT).

Reference letter: RCZSiUT — ICT Networks and Services Management Centre (Polish Ministry of National Defence)Reference letter — RCZSiUT — ICT Networks and Services Management Centre (Polish Ministry of National Defence)Modernisation of the MON (Polish Ministry of National Defence) server room in Bydgoszcz — data centre with ROTARY UPS · 2015

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The documentation they produced met the highest standards. (…) The design services provided by this team are worthy of recommendation to other organisations. (translated from Polish)
Sales Director, Building Automation Division, Asseco Poland S.A. — Tier III data processing centre, Kraków · 2013 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland