Avia Housing Estate — Power Supply, Kraków

Buildings E4, E9 and E10 on the site of a former runway (Budimex): electrical, ELV systems, and MV networks with substations for the entire estate.

Avia Housing Estate — Power Supply, Kraków

Project description

Scope and solutions

Avia housing estate in Kraków-Czyżyny, on the site of a former airport runway — client Budimex Nieruchomości, architecture by B2 Studio. Building permit and detailed design of electrical installations and ELV systems for buildings E4, E9 and E10, and MV networks with transformer substations for the entire estate, including power supply from the Tauron network.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland