Browar Mieszczański, Wrocław — 20/10/0.4 kV MV Substation

Reconstruction of the 20/10/0.4 kV MV transformer substation — building permit and detailed design.

Browar Mieszczański, Wrocław — 20/10/0.4 kV MV Substation
Photo: Mutus44 / Wikimedia Commons, CC BY-SA 4.0

Project description

Scope and solutions

Browar Mieszczański in Wrocław. Building permit and detailed design for the reconstruction of the 20/10/0.4 kV MV transformer substation.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland