Residential · 2019–2020

Forester's Lodge, Bieszczady

House in the Bieszczady Mountains by Medusa Group (352 m², 2020): power supply with backup, controls, lightning protection, I&HAS, CCTV, telecommunications link.

Forester's Lodge, Bieszczady

Project description

Scope and solutions

House in the Bieszczady Mountains — a contemporary forester's lodge with a usable floor area of 352.58 m² (client Henniger Investment), designed by Medusa Group in 2019, completed 2020; Eko Elprom is credited on the studio's website as the electrical designer. Scope: power supply to the building from the LV network with backup (generator set), switchboards, power and lighting installations, lighting and heating control, lightning and surge protection adapted to the mountain exposure, structured cabling, intruder and hold-up alarm system (I&HAS) and CCTV, and a telecommunications link in an area without urban infrastructure.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland