Infrastructure
Integrated Transport Interchange, Białystok
Interchange hub at the PKP railway station: lighting, power supply for passenger infrastructure, CCTV, passenger information.

Project description
Scope and solutions
The project covered the comprehensive design of the power and telecommunications infrastructure for the Integrated Transport Interchange in Białystok. The design included MV service connections, MV and LV power distribution networks, site lighting and transformer substations. It also provided for construction of a telecom service connection and extension of the telecommunications network with a telecom cable duct system. Internal electrical installations and ELV systems were also designed, ensuring the functionality and safety of the entire interchange infrastructure.
Projects
Other projects

Old Market Square, Poznań (City of Poznań, design & build, BIM): from concept design and functional and utility programme (PFU) to detailed design and designer's site supervision — electrical and ELV disciplines in a consortium with WLC.

MV power supply for the TBM boring the tunnel on the S19 — containerised substations, cable lines, coordination with the distribution system operator; for Mostostal Warszawa.

Utility servicing of the Nowa Huta Przyszłości investment areas: MV/LV networks, substations, road lighting, telecom cable duct system.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland
Office
Electrical department
ELV department
Telecommunications design
+48 533 317 286
HVAC automation & BMS
+48 507 874 718