Wastewater Treatment Plant, Radzymin

Treatment plant modernisation: process power supply, switchgear, instrumentation & control (I&C), lighting and external networks.

Wastewater Treatment Plant, Radzymin

Project description

Scope and solutions

The modernisation project for the Radzymin wastewater treatment plant covered the extension and upgrading of the site's power and telecommunications infrastructure. The scope included MV service connections, MV and LV power distribution networks, the lighting system and transformer substations. It also covered construction of a telecom service connection and telecommunications network with a telecom cable duct system. The project further included internal electrical installations and ELV systems, ensuring reliable and efficient operation of all plant systems in line with modern technical standards.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland