Infrastructure · 2011

Zosin Border Crossing

Extension of a road border crossing — electrical, access control, CCTV, I&HAS, FAS, IT, networks and telecommunications.

Zosin Border Crossing

Project description

Scope and solutions

“Extension of the Zosin road border crossing” for the Lublin Border Crossings Authority in Chełm (Lubelski Zarząd Obsługi Przejść Granicznych) — designs of electrical installations, access control, CCTV, intruder and hold-up alarm system (I&HAS), fire alarm system (FAS) and IT, as well as power and telecommunications networks, with bills of quantities, client's cost estimates and specifications (01–08.2011), as a subcontractor to TOBIN Consulting Engineers. Reference from TOBIN (08.2012).

Reference letter: TOBIN Consulting EngineersReference letter — TOBIN Consulting EngineersExtension of the Zosin road border crossing · 2012

Contact

Planning a similar project?

Describe the building and the project stage — we will reply within one working day and send a quote with a schedule within two working days.

The company carried out the work entrusted to it with the utmost care, maintaining a high standard of documentation and always on time. (translated from Polish)
Project Manager, ANNA-BUD Sp. z o.o. (general contractor) — Air traffic control tower with airport fire station, Warsaw-Radom Airport · 2022 · See the reference letter →

Quick enquiry

Reply within 1 working day, quote within 2. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland